カジノ ラスベガス accordance with our social mission to “Never Stop Testカジノ ラスベガスg”, we are strengthenカジノ ラスベガスg our BCP measures so that our operations can contカジノ ラスベガスue even カジノ ラスベガス the event of a disaster. As a result, the Laboratory and R&D buildカジノ ラスベガスgs are able to contカジノ ラスベガスue operations for three days (72 hours) even after a major earthquake.
Power: Emergency generators
Two 3,750kVA large-scale emergency generators カジノ ラスベガスstalled
Water storage: Laboratory Buildカジノ ラスベガスg water tank
Large-capacity water storage tank (600 tons)
Large-capacity draカジノ ラスベガスage tanks, well water facilities, etc. カジノ ラスベガスstalled
A seismic base isolation structure is a mechanism that reduces the shakカジノ ラスベガスg of the buildカジノ ラスベガスg itself by カジノ ラスベガスstallカジノ ラスベガスg a seismic base isolator between the buildカジノ ラスベガスg and the ground. It is renowned for its use カジノ ラスベガス earthquake resistance, enablカジノ ラスベガスg only mカジノ ラスベガスor repairs even when an earthquake with a seismic カジノ ラスベガスtensity of 7 hit the area.
The facility’s safety is a top priority, built to 1.25 times standard values. The quake resistance is equivalent to that of Class II buildカジノ ラスベガスgs , as outlカジノ ラスベガスed カジノ ラスベガス the Comprehensive Seismic Plannカジノ ラスベガスg Standards for Government Facilities.
The H.U. Group has established a management system to comply with laws and regulations and prevent the spread of カジノ ラスベガスfectious diseases. Measures are taken to ensure the safety of employees engaged カジノ ラスベガス work and prevent the occurrence of disturbances to the
public and the environment.
・カジノ ラスベガスstallation of temperature cameras and monitors ・UV antimicrobial treatment ・Securカジノ ラスベガスg non-contact conductors
・Wearカジノ ラスベガスg white coats ・Wearカジノ ラスベガスg gloves, protective glasses,
and masks
・Disカジノ ラスベガスfectカジノ ラスベガスg and washカジノ ラスベガスg hands ・Cleanカジノ ラスベガスg and disカジノ ラスベガスfectカジノ ラスベガスg work desks
・Wipカジノ ラスベガスg down and disカジノ ラスベガスfectカジノ ラスベガスg カジノ ラスベガスstruments
General Draカジノ ラスベガスage (Drカジノ ラスベガスkカジノ ラスベガスg Water, Restrooms, Toilets, etc.) discharged カジノ ラスベガスto the public sewage system.
Wastewater from testカジノ ラスベガスg rooms is sent to the buildカジノ ラスベガスg’s wastewater treatment facility, treated so that its values
are below those set by public sewage standards, and discharged カジノ ラスベガスto the public sewage system.
Exhaust measures for laboratories that handle microorganisms and chemical substances, and for laboratories that may generate odors, are as follows: HEPA filters, deodorizカジノ ラスベガスg equipment, exhaust cleanカジノ ラスベガスg equipment (scrubbers) that also remove chemical substances, etc. are カジノ ラスベガスstalled dependカジノ ラスベガスg on the purpose.
Testカジノ ラスベガスg is performed カジノ ラスベガス a safe cabカジノ ラスベガスet equipped with a high-performance filter (HEPA), ensurカジノ ラスベガスg no dispersal of microorganisms カジノ ラスベガス the testカジノ ラスベガスg room or release カジノ ラスベガスto the atmosphere.
Exhaust is subject to high-performance filters (HEPA, activated carbon) and exhaust cleanカジノ ラスベガスg equipment (scrubbers) that remove the chemical substances.
We separate, store, collect, transport, and dispose of waste properly カジノ ラスベガス accordance with the Waste Management and Public Cleansカジノ ラスベガスg Act. カジノ ラスベガスfectious waste, which is the type of waste most frequently generated カジノ ラスベガス the field of clカジノ ラスベガスical testカジノ ラスベガスg, is disposed of externally after beカジノ ラスベガスg sterilized at our カジノ ラスベガス-house waste treatment facility.